Aufsatz(elektronisch)September 1993

An Experimental Comparison of Time‐Based and Economic‐Based Scheduling Methods to Maximize Net Present Value*

In: Decision sciences, Band 24, Heft 5, S. 1037-1056

Verfügbarkeit an Ihrem Standort wird überprüft

Abstract

ABSTRACTIn the past, performance in dynamic‐scheduling environments was primarily measured in terms of time or physical shop characteristics. Objectives such as mean tardiness, flow time, and work‐in‐process inventory were commonly used. Today, there is increasing interest in the use of more advanced economic performance measures. These measures have the more comprehensive objective of maximizing ownership wealth by economically scheduling jobs and tasks.This study presents a large‐scale experiment testing time‐based and economic‐based scheduling methods in a dynamic job shop. These methods are evaluated on their ability to maximize net present value (NPV). The study considers the just‐in‐time (JIT) delivery environment. The job shop is hypothetical, but is based on models of real production situations. Results show that the use of very detailed economic information in a sophisticated manner generally improves economic performance. Where due dates are easy to achieve, however, time‐based scheduling methods are at least as good as those based on economics. Also, where utilization is high and due dates tight, early cost information in release and dispatch is detrimental to schedule value.

Sprachen

Englisch

Verlag

Wiley

ISSN: 1540-5915

DOI

10.1111/j.1540-5915.1993.tb00502.x

Problem melden

Wenn Sie Probleme mit dem Zugriff auf einen gefundenen Titel haben, können Sie sich über dieses Formular gern an uns wenden. Schreiben Sie uns hierüber auch gern, wenn Ihnen Fehler in der Titelanzeige aufgefallen sind.