S3C_Meter Installation Report
The Meter Installation workshop was conducted by TNS for EDP Distribuição on its position as active partner on the work package 5 of S3C, an European Union FP7 funded project. EDP Distribuição tested it's meter installation process and the tools and guidelines developed by S3C for this effect in the following InovGridtest sites: Alcochete, Évora(Guadalupe), Parquedas Nações, Lamego and São João da Madeira. In the meter installation initiative, EDP Distribuição tested the following guidelines (which were developed in deliverable 4.1 of the S3C project): •Meter installation •Training Installers •FAQ during installation process